First of all, customers need to send 3d, 2d drawings need to specify the material and precision requirements of our engineers can be carried out on the product molds and processing costs of the quotation, quotation usually takes 1 day because the main engineering and the boss this side to review the quotation. Once the quote is confirmed, we can enter the engineering communication.
We provide a detailed DFM to ensure that subsequent problems can be minimized, firstly for thickness and chamfering corrections, then for mold pulling or structure that is not conducive to flow resulting in sand holes, skinning, cold segregation, as well as communication on the accuracy of the mounting position.
After confirming the DFM, we will start the molding process.
1:Drilling and tapping by milling machine or deep hole drilling.
2:CNC roughing
3:Hardening 46-48° (hardness depends on the size)
4:Fine milling to hit the right angle
5:CNC finishing
6:EDM discharge
7: CMM three-dimensional measurement (no three-dimensional can height ruler check)
8:Mold saving
9.Assembly
Temperature of the furnace → lifting the mold into the mold → locking the mold slot → locking the screw holes of the tie rods → connecting the oil pipe to the slider cylinder → adjusting the base action without error or interference → connecting the oil and water circuits → the temperature of the mold is determined → checking the PQ square diagram to adjust the pressure and punch speed
→Trial mold 100PCS→No obvious defects on the surface of the mold.
Scrape the cape burr→CNC processing→drilling and tapping→polishing and grinding→powder spraying surface treatment→sending samples to customers to confirm the samples→signing sample card→both sides confirm the sample board→conducting trial production→shipping to customers.